DUMP TRAILER Electrical power UNIT

DUMP TRAILER Electrical power UNIT- SINGLE ACTING
Standard Description
This power unit features a power up gravity down circuit. Start out the motor to lengthen the cylinder and activate the solenoid valve to retract the circuit. Guide override to solenoid valve might be offered if necessary. Also a pressure compen sated flow control might be added for the circuit to regulate the descent velocity on the cylinder.
Remark: Please consult our product sales engineer for the distinctive pump displacement, motor electrical power or tank capability.
Distinctive Notes
one. This energy unit is of S3 duty cycle, i.e., non-continuous operation, thirty seconds on and 270 seconds off.
2. Clean every one of the hydraulic parts concerned just before installation of the electrical power unit.
3. Viscosity in the hydraulic oil shoud be 15~46 cst,which really should also be clean and free of charge of impurities.N46 hydraulic oil is encouraged.
4. The energy unit need to be mounted horizontally.
five. Check the oil degree while in the tank just after the original running with the power unit.
6. Oil altering is required soon after the original 100 operation hours, afterwards when every single 3000 hrs.

DUMP TRAILER Energy UNIT-DOUBLE ACTING
General Description
This electrical power unit features a energy up electrical power down circuit with load holding on each A & B ports. A strain compensatred flow manage might be additional to circuit to manage the decent speed of the cylinder.
Exclusive Notes
one. This energy unit is of S3 duty cycle, i.e., non-continuous operation, thirty seconds on and 270 seconds off.
two. Clean all the hydraulic parts concerned just before installation of the energy unit.
3. Viscosity in the hydraulic oil shoud be 15~46 cst, which should also be clean and totally free of impurities. N46 hydraulic oil is advised.
four. The power unit ought to be mounted horizontally.
five. Check the oil level inside the tank following the first running of your electrical power unit.
6. Oil altering is needed right after the preliminary one hundred operation hrs, afterwards when each and every 3000 hours.